Skip to content

Schedule shoot days

  1. Open your project and click Schedule in the sidebar.
  2. Click Add Shoot Day, pick the Date, optionally type a Label, and click Add day. Repeat for each day. Days are numbered by date order.
  3. Select a day in the Shoot Days rail.
  4. Click Add scene and pick a scene; its shots land on the day. Repeat until the day is built.
  5. Drag strips to set the running order. Set the day’s General call time from the day’s three-dot menu; times and the Estimated wrap recalculate automatically.
  6. Add non-scene items with Quick blocks (Crew Call, Lunch, Company Move, and more) or Custom Block. Drag a block between two shots of a scene to split the scene around it, or use a shot’s Split scene before this shot; a part’s menu has Rejoin with previous part, or Rejoin with next part on the first part.
  7. To move the unit during the day, click Starts at above the first block and pick where the day begins. Add a Company Move block, drag it into place, click Set destination on it, and pick the next location or search for a new address. Everything after the move happens there. Add another move for each further location.
  8. In the Roster panel, use Add cast and Add crew to assign people to the day, and Add location for any other place the day needs: pick one of the project’s saved locations, or search for an address, which becomes a saved location too.

Your schedule feeds callsheets automatically: link a callsheet to a shoot day and its scenes, times, cast, and crew flow in. See Create and send a callsheet.

To hand the schedule to others, use the Share popover: Export PDF (Compact or Detailed) or a public schedule link. See Share a read-only link.