Skip to content

Dashboard

The dashboard is your home page. It has two zones, Documents and Projects, for the current workspace, and a panel beside them with your Calendar, Ideas and To do.

Click Home at the top of the sidebar, or open the app root. The sidebar’s Starred, Completed and Archived rows under Projects open those lists of projects (see Completed projects). Archived documents are listed in the Archived view too.

Standalone documents that are not attached to any project, in a row you scroll sideways. Each card shows a thumbnail, the title, a type badge, and how long ago it was last changed. Click a card to open the document.

  • Filter by type: the pills beside the title are All and one icon each for Whiteboard, Diagram, Beat board, Slides, Document and Script. A type with nothing in it shows “Nothing of this type yet”.
  • Create: click New document and pick Whiteboard, Diagram, Beat Board, Slides, Document or Script. The new document opens immediately with a title like Untitled Whiteboard.
  • Card menu (the three-dot button on the card): Rename, Create project, Archive and Delete. Delete asks first in the Delete document dialog; Delete forever cannot be undone. An archived document leaves the row and is listed in the Archived view.
  • See them all: click the Documents title or the expand button beside it to open every document in a larger panel, with the same type pills and New document.

With no documents the zone reads No documents.

  1. Open a document card’s menu and choose Create project.
  2. In the Create project dialog, set the Project title. The document moves into the new project.
  3. Click Create project. The new project appears first in the Projects grid, and a message names it with an Open button that takes you to its Documents page.

Project cards show the cover, title, a stage pill, the date range or No dates set, and scene and shot counts (for example 12 Sc · 48 Sh). The pill names the project’s stage as you set it (Development, Pre-Production, Production, Post-Production, Distribution, or your custom stage), in colour. A project with no stage shows Pre-Production, Production or Post-Production from its status. Projects shared with collaborators get an accent ring. Completed and archived projects are not in this grid: they have their own Completed and Archived views.

  • Open: click the card.
  • Filter: the pills beside the title are All, Recent, Shared with me and Mine. Recent orders projects by when you last opened them.
  • Star: hover a card and click its star. Starred projects come first in the grid, the newest star first. A star stays visible on the card.
  • New project: click New project beside the title to open the project wizard. See Create a project. To create a project from your files, choose From a brief in the wizard (Team plan or higher). See Import a brief.
  • See them all: click the Projects title or the expand button beside it to open the grid in a larger panel.
  • Card menu: the three-dot button on the card, or a right click anywhere on the card. Owners of an open project get Rename and the cover actions (Add cover, Replace cover, Remove cover). The owner who can complete the project gets Mark completed (see Completed projects). Stage is offered to the project owner, to workspace owners and admins, and to project admins. Owners get Archive and Delete project; collaborators who do not own the project get Leave project instead.
  • Stage (in the card menu): hover it, or tap it on a phone, to see every project stage (Development, Pre-Production, Production, Post-Production, Distribution) with the current one ticked. Pick one to change the project’s stage, and its status pill, without opening Project Settings. A custom stage set in Project Settings is not in the list, so no stage is ticked.

With no projects the zone reads No projects.

  • Archive asks for confirmation. If you could mark the project completed instead, the Archive project? dialog suggests it: “Complete it so crew and cast can claim credits on Backlot.” Choose Mark completed or Archive anyway. Otherwise the Archive project dialog explains that archiving removes all collaborators from the project and frees a place in your plan’s collaborator pool for each one who is not on another of your projects, because the pool counts distinct people across your whole account, not one allowance per project. Pending invites are not revoked by archiving and keep their place. You can restore the project later, but collaborators must be re-invited. See Billing and usage.
  • Archived projects live in the Archived sidebar view. Unarchive restores one instantly.
  • Delete project opens the Delete project dialog. Type the exact project title, then click Delete permanently. This deletes the project and everything in it, and cannot be undone. In the Archived view the card menu of an archived project offers Delete permanently, with the same typed confirmation.

Click Calendar/Ideas in the top bar to open or close the panel. It slides in beside the zones, and the dashboard remembers whether you left it open.

A month of shoot days from every project you can open, in every workspace, including completed ones, each project in its own colour. Use the arrows beside the month to move. Click a shoot day to open that project’s Schedule. With nothing in the month it reads No dates.

  • Add dates: choose a project, then add a shoot day as on the schedule. Only projects you can edit are offered, never a completed or archived one.
  • Expand calendar opens a larger month with a Projects list beside it, naming each project’s dates that month. Click a project in the list to hide or show its days.

Click New idea, type, and press Enter. Each idea shows how long ago you wrote it. The archive button on an idea archives it. Archived ideas shows the archived ones, where the same button restores an idea. The collapse button folds the block to its title.

Your tasks, sorted into Today (including anything overdue), Tomorrow and Later (including tasks with no due date).

  • In your Personal workspace, the list holds your own to dos plus the project tasks assigned to you in that workspace’s projects. In an organisation workspace, it holds the workspace’s general to dos, which every member shares, plus the project tasks assigned to you there.
  • Add task: type and press Enter. A task added under Today or Tomorrow is due that day. In an organisation workspace, the Add to list beside the field puts it under General or one of the workspace’s projects you can edit.
  • On a task: click the circle to mark it done, click the title to rename it, click the date (or the calendar icon) to set or change the due date, or Clear date. The x deletes it, and the message that follows has Undo. A project task shows the project’s name and the people assigned to it.
  • Done tasks shows completed tasks; click it again for the open ones.
  • Expand to do opens the full list with All, Today, Tomorrow and Later, and your tasks on a calendar beside it under On the calendar.

You can also capture ideas and to dos from the sidebar plus button if you set it to Quick Idea or Quick To-do (see Navigation and search).

Chats in the sidebar header, on every page that has the sidebar, opens one drawer for your project chats and your Backlot messages. Its count is the number of conversations with unread messages.

  • Filter with All, Backlot and Projects (Backlot shows when you have Backlot access), or type in Search.
  • Each row shows the project or person, the last message, when it was sent, and its unread count. Click a row to read and answer it in the drawer. Back to chats returns to the list. A Backlot conversation also has Open on Backlot.
  • With no conversations the drawer reads “No conversations yet”.

The dashboard shows the same content in one column. There is no sidebar, so the top bar has two round buttons: Chats, with the unread count, opens the same Chats drawer, and Calendar and ideas opens the Calendar, Ideas and To do panel above the zones. New document and New project sit under each zone’s title.

The workspace switcher at the top of the sidebar changes which workspace’s documents and projects you see. See Projects and workspaces and Manage workspaces.

Workspace viewers see the dashboard read only: no New document or New project, and no document card menus.